Chapter Status

Look below chapter list for stoplight bullet values

 Chapter 3 – Build Prep

 Chapter 4 – Bulkheads

 Chapter 5 – Fuselage Sides

 Chapter 6 – Fuselage Assembly

 Chapter 7 – Fuselage Exterior

 Chapter 8 – Rollover Structure & Seat Belts

 Section VI – Landing Brake

Chapter 9 – Main Gear

Chapter 10 – Roncz Canard

 Chapter 11 – Elevators

 Chapter 12 – Canard Installation

Chapter 13 – Nose & Nose Gear

 Chapter 14 – Center Section Spar: Spar Box
.                       Center Section Spar: Shear Web & Spar Caps
.                       Center Section Spar: Final Steps
.
                       Center Section Spar: Mounting to Fuselage

Chapter 15 – Firewall & Accessories

Chapter 16 – Control System

 Chapter 17 – Pitch & Roll Trim

Chapter 18 – Canopy

Chapter 19 – Wings Build Prep
.                       Right Wing Build
.                       Left Wing Build 
.                       Mounting Wings to CS Spar

Chapter 20 – Winglets

Chapter 21 – Wing Strakes & Fuel Tanks

Chapter 22 – Electrical System

Chapter 23 – Engine Installation
.                       Cowling Test Fit

Chapter 24 – Covers, Fairings & Consoles

 Chapter 25 – Finishing

Chapter 26 – Upholstery

_________________________________________________________________________

• Green = 90-100% complete
• Yellow = 70-89% complete
• Orange = 40-69% complete

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.