The top two pictures show the F22 bulkhead before the leg holes were cut out, and the F22, F28 and Instrument Panel Bulkheads.
- F22 Bulkhead
- F28, F22 & Instrument Panel Bulkheads
- First hardware shipment
- Hardware organizer
The bottom two pics show the first batch of hardware and some of my efforts to organize all of it.