Below is the left fuselage side ready for glassing (the picture is bit blurry).
Next, these pics below show various shots of the fuselage bulkheads built in Chapter 4 being fitted in place to their locations on the right fuselage side.
Finally, below is a delamination (air bubble) at the RAM mount on the right fuselage side. I drilled the three holes and will use a syringe to fill the air gap with raw epoxy, sealing the gapped fiberglass to the material below and making it one solid entity.