Today I worked the entire day on insulating the last set of big doors.

I took this shot below to show that the first layer of insulation to go in is the 2″ thick blue-green foam, then a final top 1″ layer of white foam with a shiny aluminum foil-like surface.

Below is the final shot of the last set of big doors insulated.

I took this pic at more of an angle than above so you can see a bit more of the final wall segment –to the left– that needs to be completed. The foam panels for that wall are leaning up against the fuselage.

There is a another strip that needs to insulated, that I’ve already started, and that’s about 2/3rds of the cross strip immediately above these big doors from opening to ceiling.

Pressing forward.