1 May 2012 — Today I tore into the downstairs room that will become the second of two shops here in Germany.  The main build shop will be in the single car garage.  The glass cutting, prep and small layup shop will be downstairs in my house.  It has a fairly large window that vents out to the outside, so ventilation is ok.

I have three (3) large boxes from Feather Lite currently sitting in this room.  I cracked the boxes open not only out of shear curiosity, but to ensure all the pieces were there and make sure there wasn’t any visible damage.  Two of the large boxes contain the foam cores for all my Long-EZ’s flying surfaces:  Wings, Upper & Lower Winglets, Roncz Canard & Elevators.  [This order also included the Main Landing Gear Bow, which can be partially seen in some of these pictures]

Feather Lite Order InventoryFeather Lite Order Inventory

Feather Lite Order Inventory

Feather Lite Foam Core Inventory

Feather Lite Foam Core Inventory

The third large box contains the Upper & Lower Carbon Fiber Cowling halves that were originally designed by Mike Melvill and made off the composite plugs he designed.  The CF cowling weighs around 13 lbs, so its almost half the weight of the original glass cowling.

Feather Lite Inventory - Melvill's Carbon Fiber Cowlings

Feather Lite Order Inventory - Cowling Plans

Feather Lite Order InventoryFeather Lite Inventory - Mike Melvill's CF Cowling

Included in the large boxes were smaller pieces for the cowlings and the instructions on how to configure the cowlings to maximize engine cooling.  It’s cool thinking how these cowlings have such a significant part in the history of the Long-EZ!

 

Recent Posts

Project Update

Hey Guys,

I’ve left the painting and finishing world on this bird and am now primarily focused on the electrical system install and expect to start the avionics install in earnest in the next week or two.

Somewhat concurrently, at least mentally (ha!) I’m working to get the rudder/brake pedals configured and installed, along with the brake lines, master cylinders and reservoirs plumbed. 

Coming up soon will be the balancing, rigging and final installation of all the control surfaces.

…getting exponentially closer to finish every day!

  1. Chapter 22 – Panel tidbits in Leave a reply
  2. Chapter 22 – Voltage Reg installed Leave a reply
  3. Chapter 22 – Anything happening?! Leave a reply
  4. Chapter 22 – Another slow slog… Leave a reply
  5. Chapter 22 – One bite at a time Leave a reply
  6. Chapter 22 – Tri-Paragon Installed Leave a reply
  7. Chapter 22 – 3rd times a charm… Leave a reply
  8. Chapter 22 – Indicator Lights Leave a reply
  9. Chapter 22 – 5v Converter Runoff Leave a reply