June 2011 – Bulkheads

11 June 2011 – After another few discussions with some experienced Canardians familiar with the old glory days of the Cafe Races, I decided on another modification.  Now I’m sure this  may very well elicit some groans and ha-rumphs, and maybe even a few mutterings of how crazy I am, to put it politely, but I decided I was going pulley-less and running my rudder cables from Point-A (the rudder pedals) through a curved conduit that traverses through the centersection spar, makes a semi-shallow bend and heads to Point B (the rudders).  No fiberglass strands will be hurt in the making of this modification, just merely slightly separated at the holes in the foam so that glass strength and integrity is still in tact on the centersection spar.  So, no pulleys means that I don’t require the pulley brackets, and thus no “ears” on the firewall.

Modified Firewall

Once I finished cutting the ears off the firewall, I could get to glassing it (and laying up CF on the instrument panel).

Glassing Firewall & Instrument Panel

•••

12 June 2011 — Ok, obviously by just that fact that I’m building an “experimental” airplane I like to experiment, at least a bit.  I thought quite a lot on how I wanted my instrument panel to look.  I wasn’t sure exactly, but I figured I would make the top layer Carbon Fiber on the front face of the panel to A) Add stiffness and B) Add coolness.  I ordered some CF in my last Aircraft Spruce order and after it came in, I assessed it one last time and decided to pull the trigger!

Carbon Fiber Instrument Panel

 

Recent Posts

Project Update

Hey Guys,

I’ve left the painting and finishing world on this bird and am now primarily focused on the electrical system install and expect to start the avionics install in earnest in the next week or two.

Somewhat concurrently, at least mentally (ha!) I’m working to get the rudder/brake pedals configured and installed, along with the brake lines, master cylinders and reservoirs plumbed. 

Coming up soon will be the balancing, rigging and final installation of all the control surfaces.

…getting exponentially closer to finish every day!

  1. Chapter 22 – Stuffin’ it all in Leave a reply
  2. Chapter 22 – Dialin’ it in… Leave a reply
  3. Chapter 22 – Wires n’ grounds Leave a reply
  4. Chapter 22 – Panel tidbits in Leave a reply
  5. Chapter 22 – Voltage Reg installed Leave a reply
  6. Chapter 22 – Anything happening?! Leave a reply
  7. Chapter 22 – Another slow slog… Leave a reply
  8. Chapter 22 – One bite at a time Leave a reply
  9. Chapter 22 – Tri-Paragon Installed Leave a reply