Recent Posts
Project Update
Hey Guys,
Buff-out update: The right wing, canopy, top cowling and aft nose/avionics cover are all at Phil’s shop for buffing out over the next week to 10 days (or whenever… we appear to be having unscheduled delays).
The right vortilons are painted and installed on the wing, while the left vortilons are painted (minor touchups required) and ready for install on the wings. The next time I get to Phil’s shop I’ll be putting the N-number on the right wing.
The Trailing Edge Fences are pretty much constructed, but the right ones have some slight fitting issues (primarily the middle fence) so I will hold off for a few months before those get installed.
As I get time, I’ll work the instrument panel and electronics install on the fuselage, before doing the final engine configuration.
Still pressing forward… getting exponentially closer to finish every day now!
- Chapter 19/24 – Lesson learned Leave a reply
- Chapter 19/22/24 – Right fences made Leave a reply
- Chapter 19/25 – Trailing Edge Fences Leave a reply
- Chapter 19/25 – Vortilons paint final Leave a reply
- Chapter 22/25 – Magnetometers in Leave a reply
- Chapter 25 – Right wing to Phil’s Leave a reply
- Chapter 19 – Right wing fences Leave a reply
- Chapter 19/25 – Right vortilons painted Leave a reply
- Chapter 21/25 – Left wing vortilons Leave a reply