Chapter 16/22 – More GIB Stuff!

First off, let’s revisit the phases I identified a while back for finishing up the oil heat & fresh air system.  Here’s the current status of those phases using stoplight colors:

  • Phase I – Ductwork glassed
  • Phase II – Heat exchanger glassed
  • Phase III – Ductwork interface holes drilled and valves built
  • Phase IV – Ductwork installed with heat exchanger and valves in place
  • Phase V – Oil pump installed & oil lines run
  • Phase VI – Pilot seat area ductwork constructed and installed
  • Phase VII – Instrument panel forward ductwork constructed and installed
  • Phase VIII – Valve cables terminated and handles installed

I started out today by pulling the peel ply and cleaned up the 2-ply BID reinforcement layup on the lower horizontal duct for the aft mounting bolt of the heat exchanger.

I then prepped the inside of the horizontal duct for floxing in an EZ Point nut by sanding the area right around the mounting hole.

I then floxed and glassed an EZ Point nut into place and then peel plied the layup.

I then pulled out the Dremel Tool and widened the notched flat on the 1/4″ heat restrictor butterfly valve rod.

I also trimmed the edges of the GIB charger mounting flange immediately adjacent to the riveted nutplates.

Here’s a closer look at the trimmed flange on the GIB charger mounting flange.

I then cleaned up the layup on the right armrest midpoint hardpoint.  I then set the countersunk screw in place so that it would be visible by the camera.

I then installed the screw completely to show the screw’s low profile.  If you’re wondering where the screw is located, look at the small mark at about the midpoint of the edge of the storage pocket.

I then took about 15 minutes to mark and cut the right armrest storage pocket lid hinge.  I then mocked it up in place by taping the hinge to the fuselage sidewall.

After the EZ Point nut layup cured, I cleaned up the layup and then mounted the heat exchanger at its aft mounting hole onto the EZ Point hardpoint.

With the aft mounting bolt in place, I was then able to locate the forward heat exchanger mounting hole position.

I marked the position of the forward mounting bolt and then removed both the heat exchanger and the underlying ductwork.  I then drilled the forward mounting bolt hole and remounted the heat exchanger back onto the ducts.

I then ensured the lower duct on the heat exchanger was positioned correctly to further allow me to mark the transition hole that allows the warm air to flow from the heat exchanger’s lower duct back into the duct network.

I then drilled & shaped the duct air transition hole.

Here’s a closer shot of the air transition hole from the heat exchanger’s lower duct into the duct network

I then prepped the glass around the forward heat exchanger mounting hole on the ductwork assembly and laid up 2 plies of BID to reinforce the duct network when the heat exchanger is mounted to the face of it.

I then assessed the airflow through the heat exchanger lower duct (outlet) and decided to glass a dam in the top side of it where the air transition hole mates up to the ductwork network to keep the air from getting trapped in the top corner above the transition hole.

I used a taped piece of foam as the form for the dam and laid up 1 ply of BID for the dam wall.

I laid up the glass a tad wet primarily since the form and glass wasn’t solidly in place, and since I covered it with a more refined micro “ramp” shown below.

Here’s the ramp that I micro’d in place in the heat exchanger lower duct (outlet).  I waited until the layup above was tacky, whipped up some micro and then formed the micro ramp.

I then set my sights on the heat restrictor (butterfly) valve by marking the valve rod for cutting.

I then cut the 1/4″ butterfly valve rod to length.

I then test fitted the cut 1/4″ butterfly valve rod with the valve lever in place as well.  The pic below shows the outboard side of the heat exchanger’s upper (inlet) duct.

And here’s a shot of the inboard side of the heat exchanger’s upper (inlet) duct.

Tomorrow will be a very light build day since I’m helping my friends that are moving here in the next couple of weeks.

 

Chapter 22/24 – GIB STUFF!

First off, I’d like to convey my latest task sequence plan for the build.  My immediate goal is to finish up the GIB area components since those will be the hardest to work after the strakes are installed.  I’m giving myself up until 1 August to finish up these GIB seat area, pilot seat area, and nose component installs and then move on to building and glassing the top of the nose.  Then I’ll move onto constructing the canopy.

As for today, I started off by prepping the left GIB armrest forward mounting bracket for getting floxed to the left fuselage sidewall.

After mounting the forward mounting bracket to the left GIB armrest with its attach bolt, I then mixed up some flox and slathered it onto the outboard side of the mounting bracket.

I then mounted the left GIB armrest into place, installing the 4 aft bolts into place to hold the freshly floxed armrest forward mounting bracket firmly against the fuselage sidewall.

I used the same epoxy that I used above to layup a ply of BID to seal the cut angled edge of the heat exchanger lower duct piece.  This edge was one that I had to cut to remove the duct piece off to the heat exchanger cover.  I then peel plied it.

While the epoxy above cured I digressed a bit to knock out a small task that while not needing accomplished just now, curiosity got the best of me.  I drilled and riveted 2 nutplates to the GIB cigarette lighter charger that will be used in mounting it later on.

Here’s a shot of the backside of the riveted nutplates.

In addition, I also mounted the two 1/2″ oil heat lines that terminate into the reducers mounted into the left side bulkhead that is an extension of the GIB thigh support fuel sump front wall (no pics).  There’s not a lot of space to get in there to mount the oil line fittings, so it took a bit of time to get them installed.  I still plan on making a specialized wrench that will better allow me to install & remove these 1/2″ oil lines due to this limited space.

By the time I finished riveting the nutplates onto the GIB charger & installing the oil lines, the layup on the heat exchanger lower duct piece was cured enough that I pulled the peel ply & cleaned it up.  I then “mounted” it on the heat exchanger, positioned it in place where it will be mounted in the cockpit, and then drilled a hole through the aft heat exchanger mounting hole into the lower horizontal duct that sits immediately behind (outboard) of the heat exchanger.

I then removed the ductwork and sanded down a 2″ wide swath from the top edge of the lower duct flange to the bottom flange edge, with the mounting hole in the center (1″ mark) of the sanded swath.

Here’s a wider angle shot.

I then laid up a 2″ wide ply of BID from the top edge of the horizontal duct flange to the bottom flange edge for reinforcement when the heat exchanger is mounted.  For a little extra strength, I also laid up a second ply of BID 1.5″ wide that terminated on the bottom and top edge of the actual duct (not the flanges).  I then peel plied the layup.

I had also cut out a 0.5mm piece of aluminum (from my German stock) to use as a hardpoint for the midpoint attachment of the right side storage pocket to the right GIB armrest.  This setup is simply to reinforce the midpoint glass so that it won’t crack under the pressure of the countersunk screw that will be mounted.

I then floxed the aluminum piece in place and covered it with 1 ply of BID using the epoxy that I had made for the layup above.  I then peel plied this layup as well.

I then removed the left GIB armrest to reveal the forward mounting bracket, which of course also serves as the GIB headset jack plate and PTT button mount.  I had just a bit of flox leftover from the previous layups, so I used that to seal the perimeter of the flox on the bracket.

Here are a couple more shots of the left GIB armrest forward mounting bracket floxed in place.

Here’s a pic of not only the left GIB armrest forward mounting bracket floxed in place, but also the two 1/2″ oil heat lines that I mounted earlier.

Here’s a shot of the oil feed line that I previously mounted that comes out of the oil pump and to the heat exchanger via the 1/2″ to 3/8″ reducer.  In the foreground you can see the oil return line that comes from the heat exchanger back to the engine oil sump.  I terminated this oil return line hose with the AN-8 fitting just prior to taking this pic.

My final task of the evening was working on the heat exchanger upper inlet duct’s restrictor (butterfly) valve.  I started off by redrilling the valve mounting holes that I had covered up with the reinforcement plies of BID, then inserting the valve plate’s mounting rod into the duct holes and marking the sidewall positions onto the rod.

I then Dremeled and filed a flat spot almost 1/16″ (0.060″) deep into the valve plate’s mounting rod specifically to mount the valve plate to.

The diameter of the valve rod is 0.240″.

And as you can see, the width of the rod after I cut nearly 1/16″ of it out, is 0.180″.  Makes sense eh?

Here is the valve rod installed in the duct with the valve plate mounting flat showing.  As you can see, I need to make the flat a little wider so that the edges of the valve plate sit flush with the duct sidewalls.

I’ve left the heat restrictor valve rod long for now, but will be cutting it to length in the next day or two after I’ve worked out & finalized all the other working valve dimensions.  It will most likely get cut at the spot where the tip of the pencil is pointing to.

The side shown below is the outboard side, so as I mentioned before the valve lever will operate “behind” the heat exchanger and away from any body parts of the delicate GIBs! ha!

Here’s the inboard side of the heat exchanger, with the restraining E-clip showing on the inboard end of the heat restrictor valve rod.

Tomorrow I will continue to work all the GIB area component installs, including working to finalize all the stuff I worked on today.

 

 

 

Chapter 22 – Heat Exchanger Wrap-up

Wrap-up as far as sealing up the heat exchanger . . .

I spent about 45 min pulling the peel ply from both the aft end layups of the heat exchanger and side reinforcement ply of BID layups on the upper/inlet duct.

And on cleaning up the peel ply strings and the edges of each layup on both sets of layups.

The heat exchanger needs a good sanding to smooth out all these mini-layups, but beyond that I’m done with the mechanical resealing of the heat exchanger.  Tomorrow I’ll jump back in to get a lot more work done.  In fact, I need this week to be a very productive one to get all these ancillary (read: non-airframe) components completed and off the to-do list.

 

 

Chapter 22 – Heat Exchanger Valves

This past week hasn’t allowed for a lot of major build efforts, and I expect that won’t change until starting on Monday.  I have some good friends that are moving out of the area so I’ll be spending a bit more time with them over the next couple of weeks.

Today I started out by sorting through & figuring out LED lights for the GIB area floor area lights that will be located in the fuel sump tanks’ low fuel warning sensors covers.  After figuring out the LEDs, I then updated my cockpit lighting wiring diagram.

I then mocked up the upper & lower heat exchanger ducts after my design, placement, and initial construction of the heat restrictor valve (butterfly style) that resides towards the aft end of the heat exchanger inlet duct.

I would have preferred to have the heat restrictor valve located about 1-1/2″ forward, where you may be able to see a location dot.  However, since I wanted the valve’s actuator arm on the outboard side of the heat exchanger unit for clearance to keep it from hitting the GIB’s knee or leg when the valve is actuated, I had to place it a bit aft of where I wanted (where it is in the pic below) to allow for valve actuator arm clearance with the underlying (outboard, on the cockpit wall) ductwork.

I then laid up 4 more small pieces of BID on the aft side of the heat exchanger to finalize the sealing up of the heat exchanger cover.  In addition, I added a 1-ply BID “patch” on each side of the heat exchanger upper inlet duct around the heat restrictor valve mounting holes (seen on the right side in the pic below).

Tomorrow will be another light to non-build day.  Again, however, I plan to be back at it hot ‘n heavy on Monday.

Chapter 22 – Resealing heat exchanger

Today I glassed round 2 of securing the halves of the heat exchanger back together.  I started by simply filling in the 2″ gaps created by the duct tape that I used to hold the 2 sides together tightly.  Again, I used 1 ply of BID as I did before.

I then glassed a small patch of BID on each forward corner (top side in pics below).

Finally, for this round I went to the aft side and laid up a small 1-ply BID patch just outside of the AN fitting posts on the corners (bottom in pics below).

I then peel plied all these small layups.

Later in the evening I pulled peel ply from the layups and cleaned up the layups.

I have 1 more round of layups to finish up the closure of the heat exchanger, which I’ll work on tomorrow.

 

 

Chapter 22 – Heat exchanger whole again!

This morning I woke up feeling like hammered dog crap… not good with a nasty cold.  It came on immediately and of course I’m not sure how long this will last, but the bottom line is that any shop build tasks is not happening today.

Since I was feeling less than stellar, I took the opportunity to spend a few hours on my website.  I parsed out the last few weeks of Blog updates to their respective chapter build logs.  I then backed up my website and updated my site to the latest version of WordPress.

I actually went down last night after I finished yesterday’s post to pull peel ply and razor trim the first round of layups that secure the heat exchanger halves back together, with the heater core secured inside.  Except for the corners, which I basically just trimmed away, all the layups looked fine.  Here’s a shot of the top edge.

Here’s a shot of the inlet on the top side of the heat exchanger.  It still needs just a bit of cleanup on the edges, but beyond that I’m pleased with how the heat exchanger is coming along.

Here’s the bottom side of the heat exchanger.

Tomorrow I’ll be heading up (if I feel better) to visit some friends in the Dulles area, so not much building going on tomorrow as well.

 

 

Chapter 22 – Oil pump bracket installed

Today I started out by pulling all the tape off of the oil heat pump and checked the clearances both front and aft.  The clearances thankfully looked good.  As a side note, with the rubber vibration pads, I can tweak the clearance biased either forward or aft a bit just by the amount of torque I place on each mounting bolt.

I then placed the oil pump fittings back in place, but this time I went ahead and put the AN hose fitting that will go on the end of the oil feed line that heads towards the heat exchanger.

Here’s a shot of the cured and cleaned up oil heat pump mounting bracket.

And another shot.

I then prepregged the next and final round of glass for the oil heat pump mounting bracket installation.  I laid up 2-plies of UNI over the edge of each foam upright support tab (after adding micro slurry to the foam and a bit of flox as a transition at the front edge with the seat glass), and then a 2-ply BID tape along the bottom side intersection of the bracket and the back seat (see below).

Here’s the final installed oil heat pump mounting bracket.

In addition to the 2-ply BID tape, I also laid up a 2″ x 2″ 3-ply BID tape in the center area of the bottom side bracket to GIB seat back for a total of 5 plies of BID right in the middle area of the bracket.  I couldn’t lay up a more than just the edge on the outer 1″ of each side of the bracket since the bolt studs are in the way (the ones with the black tape in the pic below).

I then got to work building the oil pump to heat exchanger hose, via the 1/2″ to 3/8″ reducer… which this hose will actually attach to.  I slid the outer housing of the AN-8 fitting into place until it bottomed out (red piece).  The blue tape behind the outer housing was to let me know if the blue fitting piece was pulling the outer housing off the hose more than it should.

I then carefully threaded the blue fitting piece into the red outer housing piece to hand tight at first, then I used a couple of crescent wrenches for the final tightening.  Not shown here is the blue tape I wrapped around each component to protect them from getting marred.

I then installed the hose onto the lower reducer fitting in the front left wall bulkhead of the sump tank.  I only tightened the fitting hand tight to get a decent idea of the hose length I needed.

I then ran the house into the hell hole through the lowest hole in the GIB seat back.  There I cut the hose to length and followed the same process as before to install the opposite end hose fitting for connecting to the oil heat pump.

I then took a bit of time working on the heat exchanger ducts.   I trimmed them up a bit at the corner where they intersect and once they were able to play nicely together, I then taped it all up.

I then spent a good 45 minutes figuring out the exact location that the heat exchanger will get installed in the GIB area in the fuselage.  I was remiss to take any pics, but I was able to mark up the existing ductwork (that I have yet to permanently install) and the fuselage floor to know where the heat exchanger will get remounted.

Most importantly, for today, I was able to determine how the heat exchanger will get mounted inside its cover, and in turn, how the whole unit will get mounted onto (and atop) the current ductwork.

I was originally thinking I would use spacers, but since the locations I chose for the spacers were about 0.5″ from the center holes on the heat exchanger’s side frames, I chose to simply drill those out for a #10 mounting bolt.

So I drilled out the center mounting hole on the forward end of the exchanger in short order.

And test fitted a bolt.

Then I did the same sequence on the aft end of the heat exchanger.

I then remounted the cover onto the heat exchanger, taped up the sides to ensure the heater exchanger was secure, I then shown a light up through one of the holes I had just drilled out in the metal side frame of the heat exchanger and marked it.

I then drilled a hole through both sides off the heat exchanger cover using the hole in the heat exchanger side frame as a guide.

Again, I then test fitted a bolt to ensure the hole was good.

I then did the same sequence on the other end and ended up with another hole going all the way through the heat exchanger and cover.

Here’s the heat exchanger with the mounting bolts (test ones) in place.

I then cut out some mini air dams from 1/16″ (0.063″) phenolic to keep the air out of the end “caps” of the heat exchanger cover and flowing only through the finned middle area.

The cover extending over the “U” shaped tubes on each end was glassed that way to make glassing the cover over the heat exchanger much easier.  On the front side (shown below) it also created a straight wall to use as one of the interior duct walls for the exit duct of the heat exchanger.  Finally, it simplifies the heat exchanger lines and in my opinion makes it look better.  Still, there’s no need for the air to get “lost” in those end “cap” areas so I’m keeping the air path focused so that it will run only through the fins, which are kept warm by the hot oil running through the pipes.

[As a side note, you can see the blue dot close to the hole I drilled in the frame of the heat exchanger.  That blue dot was where I had planned on putting a spacer for mounting but obviously decided against it.]

This pic is a little bit washed out, but you can make out the mini air dams at each corner of the heat exchanger.

I then prepped the outboard wall of the heat exchanger cover by sanding the strips that would mate up to the frames on each side of the finned core.

I then cut strips of foil tape and placed them on the inside of the heat exchanger to keep the heat as concentrated in that center area as possible as the air flows through it.

I then did one last test fit to ensure all my parts were good and aligned for what was next…

. . . hi-temp RTV.

I ran beads of the hi-temp RTV along the areas I sanded that would mate up with the frame of the heat exchanger.  I also put a small bit around the contoured openings for the fitting posts.

Then, using installed bolts through the mounting holes as guides, I placed the heat exchanger in place onto the beads of hi-temp RTV.  I added a good dab of hi-temp RTV at each outside corner of the heat exchanger and set the mini air dams in place, and then ran a bead along the edges of each dam to hold it in place.

I then RTV’d the top of the heat exchanger edge frame, a thin bead along the top of each phenolic mini air dam, and again a small bit around the contoured openings for the fitting posts on the opposite side.

I then set the other side of the heat exchanger cover into place to entomb the heat exchanger once more.  I then taped the 2 halves of the cover tightly on each of the 4 sides of the heat exchanger.  I then placed the entire unit on a plastic box, added a bunch of drills and heavy batteries to weight it all down in place, and then ran to the store to buy a few groceries I needed!

Upon my return, I had a quick dinner before heading back down to the shop.  In all, I let the hi-temp RTV cure a little over an hour total as I also cut the BID for the prepreg setups in prep for the initial glassing of the 2 cover halves back together over & around the heat exchanger.

I used only 1 ply of BID in prepreg setups, all 1″ wide.  Since there are some minor gaps that are understandably much wider if no pressure is placed holding the two sides together, I decided to make this a 2, possibly 3, step process (the extra one may be needed for the corners).

I taped a tight band of duct tape around each duct opening which worked well to keep the forward end (top in pics below) and middle sections tightly together.  I did need to use another bit of tape on the corners to close the gap at the bottom side in the pics below (which is the aft side of the heat exchanger).

I then laid up all the glass strips and peel plied them.

Tomorrow I’ll clean up the layups I did tonight and then prep another round of layups to finish closing out the seams in the heat exchanger cover and make it all one unit (It will be a finished unit when the upper & lower ducts are floxed into their respective places on the heat exchanger… as was shown mocked up earlier in this post).  I should also get an order I placed with Summit Racing so I’ll have more fittings on hand to continue working on the oil heat lines install.

 

Chapter 22 – It’s all about the oil!

Oil heat that is!

Again, the Chapter 22 thing might be throwing you off a bit since it’s electrical, but currently that’s where I have my oil heat system.  Thus, any discussion on the major ventilation system in this bird is married to the heat system, and ends up in Chapter 22. Weird huh?!  Yep, well, nothing about building Long-EZ’s can be considered normal!

I had to run over to Andrews AFB to scarf up some money out of one bank to transfer to another bank for my upcoming purchase of the GRT EFIS I ordered under the discount that GRT offered for Sun N Fun 2017.  Since Andrews requires some Interstate/Freeway/ Motorway driving, I decided to test out my ventilation/heat system ram air inlet.  So I drilled a couple of holes into some chip board and then zip tied the inlet to the board.  Then I duct taped the zip ties to ensure they wouldn’t slide off.

I think it’s ready to go!

I then tested it out a bit in my driveway to ensure I wouldn’t kill, maim, hurt or embarrass myself . . . or anybody else for that matter.

I quickly realized from messing around with it above, that the inlet needed to be straight into the wind as best possible, but the angle for the rest of it really didn’t matter. Regardless (or “Irregardless” for Joe Coraggio!) at around 65 mph I was getting pretty good airflow coming through.  But then when I would push my hand up against the outlet I could pretty much shut down the flow.

So, quick assessment is that it seems to have decent airflow, but not good pressure.  And in this game sports fans, pressure is what it’s all about.  Looks like it’s back to the drawing board on this baby!  [Plus, I’ll do some more detailed testing . . . I got some ideas!]

After arriving back home I quickly got into the shop with the intent of getting the 2-ply BID base reinforcement layup for the oil heat pump mounting bracket layup glassed onto the aft side of the GIB seat.  I sanded down & prepped the area for the layup.

Then I prepregged 2 plies of BID, measuring 3″ x 8″, and wet it out with MGS 335 and fast hardener.

I then glassed in the 2-ply layup and peel plied it.

Here’s another shot at an angle to help with the exact orientation of this layup.

While the oil heat pump mounting bracket base reinforcement BID curing I then trimmed up the heat exchanger top duct piece.

I then test fitted the heat exchanger top duct piece back on the heat exchanger.

With both top & bottom ducts glassed, I could then verify the exact spots where the heat exchanger top & bottom inlets would go, given their dimensions match the ducts’ dimensions of 0.75″ x 2″.

Again, for better understanding where the heat exchanger ducts are located, I identified them with a couple pieces of paper.

I then took a few minutes to mark up the lines along the entire perimeter edge of the heat exchanger cover to split the case in two and remove the heater core with all its protective tape, etc.

First though, I cut out the heat exchanger duct inlets on both the top & bottom (inlet & outlet).

After a fair amount of pulling, prying and practicing my “How to converse with Sailors” speak . . . and not to forget the requisite injury, I finally got one side off of the heat exchanger core.

Following the shampoo mantra . . . ok, the “repeat” part . . . I was finally able to get the other side pried off as well.

I then got to work deconstructing the protective barrier that Stacey had helped me construct (could this be why it was so difficult to remove?!  . . .  just kidding!).  I took a fair number of pics on this process since I didn’t take any as we applied the protection before.

Here’s the final protective tape ensemble with the top & bottom 1/4″ wood caps that all served to protect the heat exchanger core while it was completely covered with glass.

Finally, here’s the heat exchanger core with the two halves of the heat exchanger cover.

I then set the heat exchanger into one of the halves of the cover.

And then checked the fit of the heat exchanger core inside the cover.  Ahh, it’s awesome when a plan comes together!

Although I had mounted the oil heat pump to its mounting bracket much earlier in the evening, my last official build task of the evening was to flox and glass the mounting bracket to its location on the lower aft side of the GIB seat.

Before I get into that though, here’s a good shot (aft side) of how the oil heat pump will attach to the mounting bracket.

I pulled off the fittings and taped up the exposed areas of the heat pump as it sat on the mounting bracket.  I’m floxing & glassing the mounting bracket into place with the oil heat pump mounted to it to ensure clearance for the pump on both the forward and aft sides.

Although my off-center pic makes it appear more askew than it actually is, I must admit that during the initial mounting process of this thing, it did end up skewed off center about 0.070″ and is higher on one side by about 0.030″ . . . but that’s why we call it the hell hole right?! (As I told Dave Berenholtz: “Loaded up with flox on the edges of course this guy was like trying to balance a fish on a greased hard boiled egg!”)

I do have one more set of BID tapes to do on the bottom after the 2 sets of outboard vertical, 2 sets of inboard vertical, and 1 set of topside horizontal BID tapes cure.

I took this shot at an angle for as good as view as we can get of the side layups, in the hell hole and all!

The layup schedule I used was a 3-ply BID tape on each outboard vertical junction (the foam tabs & seat back), with a 2-ply BID tape on the inboard vertical junctions (inside surface of foam tabs & seat back), and a 3-ply BID tape on the horizontal junction (1/4″ plywood bracket & seat back).  Tomorrow, I’ll do a 3-ply BID tape across the bottom intersection with the seat back.  Moreover, the 2-ply vertical junctions have a lot of overlap in the interior corners, thus there’s a good amount of “5-ply” BID in the corners.

Finally, I wanted to show you all how I secured the pump/bracket assembly in place while I floxed & glassed it up.  What you can’t see in this pic is that the wood support is actually sitting atop my large shop vac.  In addition, If you look closely you’ll see that I taped 2 stir/ popsicle sticks on the front of the pump as a standoff pad so I could then just feel if it was pressed firmly against the fuselage bottom at the front and then concentrate on the aft side for clearance with the landing gear bow.

Tomorrow I’ll continue to work on the oil heat system ductwork, heat exchanger and finalizing the oil pump mounting bracket install.

 

Chapter 22 – All in a day’s work…

Seriously!

Today I started by pulling the peel ply off the heat exchanger bottom duct and cleaning it up.

Here’s the inside foam that I never got a pic of before I taped it up.  Just after I took this pic I dug it out of there.

Here’s a couple shots of the tape (with the foam removed!) that I used as the form and the actual bottom duct piece.

I then marked up the heat exchanger bottom duct for trimming with the Fein saw.

I then trimmed the bottom (outlet) heat duct with the Fein saw.

And then placed it back onto the heat exchanger cover to test the fit.  So far all looks great!

I then placed it inside the cockpit where it will sit once installed in the plane.  Again, the fit and finish are just right and all is a go at this time.

I then spent a good hour+ shaping a piece of urethane foam as the form for the heat exchanger top duct, and then taping it into place.  Again, the angle you see at the corner of the heat exchanger is the contour of the back of the pilot’s seat.

I offset the inlet and outlet of the heat ducts so that the inlet to the heat exchanger cover enters in the top aft part of the heat exchanger whereas the outlet exits out of the forward bottom part of the heat exchanger.  This offset maximizes the amount of time the air “sees” the hot oil-heated surfaces of the heat exchanger before exiting to warm up the cabin.

Also, I needed space in the inlet duct that runs from the main air feed into the heat exchanger for a heat restrictor butterfly valve.  This valve will allow me to keep the air out of the heat exchanger until the oil has time to heat up the heat exchanger and provide warm air.  Otherwise, once the valve upstream that redirects the outside cold/cool air is turned to heat, if the air is really cold and the engine oil isn’t up to temp, then that would make for a really cold “heater”!

I then glassed the heat exchanger top duct with 2 plies using a bunch of scrap UNI.  I then peel plied the layup.

I then spent a good 45 min playing around with the configuration of the oil heat pump to see exactly how I was going to mount it.  The manufacturer says it’s best to mount it with the mounting plate in the horizontal position, but they didn’t say that one or the other side had to be up.  So… I’ll be mounting it with the mounting plate in the horizontal position, just with the mounting bolts facing down.  In addition, I’ll be mounting the oil heat pump in the hell hole, at the bottom of the GIB seat just behind & under the round access hole in the GIB seat.

I settled on using my original 1/4″ Finnish Birch plywood mounting base, upside down, with a 1/4″ piece of foam on the top of each end of the wood base.  With the foam end pieces in place, it would make a Π shape, only flipped upside down to this symbol shown.  If I shaped each end foam piece to allow for the aft leaning GIB seat & the curve of the back of the seat, I could get all the 3 sides to contact the aft side of the GIB seat.  I could then flox & glass all these 3 sides (2 vertical, 1 horizontal) to the aft side of the GIB seat for a nice, strong oil heat pump mounting bracket.

After figuring all the above out, I then spent another half hour finalizing the shape of the foam upright that will connect the sides of the 1/4″ plywood plate to the aft side of the lower GIB seat.  I used a scrap piece of the urethane foam to dial in the shape, and then once I got the shape set I transferred it to 2 other scrap pieces of foam and cut out the foam end pieces I would use on the actual oil heat pump mounting bracket.  To really put all you OCD/anal retentive types into an uncontrollable tailspin, get this: I used one piece of 1/4″ H45 Divinycell foam on one side and a piece of 1/4″ H250 Divinycell foam on the other.  I bet that’ll keep you cursing me when you can’t sleep for the next month thinking about it!  ha!

I then got my glass all sorted out for glassing the top side of the oil heat pump bracket. I prepregged 2 sets of 3 ply glass using a pair of the gazillion BID triangular pieces you end up with during these builds for each ply of BID.  The schedule for the prepreg setups are BID-UNI-BID with the UNI perpendicular to the bottom edge of the side foam pieces.  The single ply of BID on the top of the 1/4″ plywood bracket [that I previously floxed the 4 mounting bolts into] is for an initial ply of BID atop this wood base.

I made up just enough MGS 335 epoxy with fast hardener to glass the 1 ply of BID on top the 1/4″ plywood base.  As the layup started to get tacky I then floxed the 2 foam end pieces into place, ensuring their outboard edges were aligned with the sides of the 1/4″ plywood.

Here’s another shot of the oil heat pump mounting bracket.  You can see that I taped up the bolts to protect them.  Also, up until today I would have called this as the oil pump bracket being upside down, but now it is actually right side up.  Also, since I had just a hair of epoxy left over, I went ahead and made up some wet micro and micro’d the inside faces of the foam end pieces.

I then made up some more epoxy with fast hardener and wet out the prepreg setups.  You can see I labeled the prepreg setups with arrows so I know the direction of the UNI cloth, which will actually get laid up 90° to how their shown here.  I also whipped up some flox, which you can see that I used to put fillets in the corners between the foam and the wood base that I just laid up a ply of BID on top of.  At this point, the BID was still very much tacky, but was quickly on it’s way to curing.

I then laid up the prepregged 3-ply glass setups, 1 on each side and squeegeed out the air in short order with the top prepreg plastic.

I then peel plied the entire top inside glass of the oil heat pump bracket with a piece of 3″ wide peel ply tape.  It looks like I added a lot of wet epoxy, but in reality the epoxy was getting really tacky since it was fast hardener, and went it on like syrup vs wet epoxy.  It still did its job however in wetting out the peel ply, it just took a bit more “coaxing!”

And yet another shot of the glassed & peel plied top/inside layup of the oil heat pump mounting bracket.

I then took a break to eat dinner and upload a bunch of these pics to this blog.  When I returned the laid up oil heat pump glass was cured to at least a good 90% I’d say. I razor trimmed and easily pulled the peel ply and the layups looked good.

Here’s a couple more shots of the cured top/inside glass on the oil heat pump mounting bracket.

I then prepped a 4-ply prepreg setup for the bottom/outside layup for the oil heat pump mounting bracket.  The layup schedule for this glass, starting from the bottom ply up was UNI-BID-UNI-BID.  Both UNI plies were biased so their fibers ran straight from the top of one side, around the bottom, straight up the other side to provide a nice cradling type strength to the layup.

After I glassed the bottom/outside of the oil heat pump mounting bracket, I then of course peel plied it.

Here’s another couple shots of the glassed bottom/outside of the oil heat pump mounting bracket.

By this point in the evening, the heat exchanger top duct layup was cured so I then pulled off the peel ply.

I then removed the whole assembly from the heat exchanger (forcibly!), removed the tape and foam from the inside of the top duct piece, and then quickly trimmed the top duct piece’s edges.

I then set the top duct piece back onto the heat exchanger to test the fit.  It looks good and I don’t see any issues at this time.  It’s way too late to fire up the Fein saw and trim this duct piece tonight, but I will get it trimmed within the next day or so.

In the amount of time it took me to write all the blathering above, when I went down to check on the oil heat pump mounting bracket bottom/outside glass layup it was cured. So I spent a good 15 min cleaning it up so I could knock it out and include in tonight’s blog.

These pics below kind of make it look like a dead bug, but here’s the cured bottom/outside layup on the oil heat pump bracket.

And here’s another shot of the top/inside of the bracket to see how the two sides came together.

Tomorrow I won’t get any building done since I’m spending the day with some friends who are moving out of the area in a few weeks.  I will be back on the build hot ‘n heavy on Monday though.

 

Chapter 22/24 – GIB Headset Jacks

Today I started out by cleaning up the 2 small layups that overlap onto the two internal sides of the PTT 1/4″ phenolic mount and the foam/flocro recessed PTT button housing junctions.

I then identified my desired positions for the headset jacks and drilled the two 3/8″ holes for those.  I then of course installed the jacks to ensure they fit  . . . which they did (yeah!).

So, here’s the forward Left GIB mounting/PTT button/headseat jacks bracket that will reside on the front face of the left GIB armrest.

Here’s the business end showing the internal side of the bracket.  Yes, it’s a bit tight in there, but it all fits fine.

And here’s an “action shot” showing the armrest front faceplate set in place.  I still have just a bit of cleanup work to do to get it all squared away cosmetically, but structurally –beyond actually installing it to the sidewall– I’m done.

To verify that there were no clearance issues with the headset plugs, I took the bracket assembly upstairs and hooked up one of my headsets.  Looks good!

Here’s close to the actual angle that the GIB will experience when plugging in their headset.

And from the other side.

The internal clearance with the plugs installed is fine as well.

I then set my sites on knocking out the lower cross connect duct that comes out of the oil heat exchanger and transits the hot air into the ductwork.  I played around for quite a while to figure out the exact duct size, especially since it was a variable along with the height of the heat exchanger off the cockpit floor.

Ok, my “standard” ducts are 3/4″ wide x 2″ high, which provides a close approximation air volume wise as 1.5″ round SCAT tubing.  The optimal height of my heat exchanger off the floor is 0.9″ (vs. 2″ high), so I clearly had some hard configuring to do.

Since the heat exchanger sits over (actually “adjacent to”) the existing ductwork that I just created –with the majority of it being over (again, “over” as in covering) the horizontal air feed to the GIB– I decided to use the area UNDER the horizontal air feed that is just outboard & to the left of the heat exchanger for a wider/flatter duct, thus letting me reclaim the approximate amount of volume lost by having to shorten my duct to 0.9″ (vs. 2″ high).

Thus, in the first pic below, you’ll see what looks like the goiter-type protrusion that sticks out on the bottom of large ocean-going vessels.  This is the widened horizontal segment of the lower heat exchanger duct, which then makes a 90° turn upwards along the forward edge of the heat exchanger until it empties out into the ductwork (near the angled part).

Additionally, the angled corner you see in the pics below is actually the intersection of the heat exchanger outlet duct where it meets the pilot seat back (NOTE: In the pics below, the heat exchanger is mounted into the board with the aft edge down).

I then laid up a bunch of UNI scraps as the first ply of glass and then laid up a ply of BID over that.  I peel plied a bunch of the edges and then took off to have dinner with a buddy of mine.

Upon my return from dinner, with the glass at a perfect “green state,” I cut the short edge and the slanted corner glass right down the middle.  I then slowly worked the rather pliable glass off the heat exchanger and then did my best to ensure all the glass was sitting exactly how it was while it was on the heat exchanger… so it would be correctly shaped when cured.

Obviously, my other option was to let it cure on the heat exchanger, Fein saw it off in 2 halves, then glass the halves back together.  Not only did I want to avoid the weight, glass usage, and hassle & time of another layup, I didn’t want to accidentally cut into the heat exchanger cover that was just a scant couple of duct tape plies from the glass I was cutting.

Tomorrow I’ll shape & glass the upper heat exchanger inlet duct, as well as trim up the outlet duct I glassed tonight.  In addition, I’ve realized that I need to get at least the aft oil heat lines installed before I install the forward Left GIB mounting bracket (for clearance). So tomorrow not only will I build a couple of oil hoses, but I’ll also start work on mounting the oil heat pump.